Project: Galena, IL
Careful planning with the end in mind is what lead us to completing this job in 35 working days, in spite of large obstacles. This project has over 2,000 tons of stone installed and a flow rate of approximately 110,000 gallons per hour! |
Project: Bannockburn, IL
A creek installation done by Ponds Inc. of Illinois at The Tarns of the Moore located in Bannockburn, Illinois. |
Project: Yorkville, IL
The Grand Reserve project was built by Ponds Inc. and ADI. It is located at the entrance of a large sub-division in Yorkville on Route 34 just east of Route 47 about 45 minutes southwest of Chicago. It has 300,000 gallons of water per hour flowing over it and was constructed of 900 tons of large boulders! Project: Olympia Fields, IL
Brief statement/testimonial about project... |
Project: Lemont, IL
The Endangered Species, Heinz Emerald Dragonfly Project for the 355 Tollway Extension. These are special ponds designed to be breeding ponds for the endangered Heinz Emerald Dragonflies located in Lemont, Illinois. This project was done for the Illinois Tollway Authority and the Dupage County Forest Preserve and overseen by university specialist. This whole project was documented by the History Channel's television series, Modern Marvels. |
BASIC INFO
|
INSTALLATION SERVICES
|
PACKAGE PRICING
|
MAINTENANCE & SERVICE
|
P.O.N.D.S. - NETWORK
|
CONTACT INFO
Office: 1-847-695-3111
Contact Us Ponds Inc. of Illinois P.O. Box 6223 Elgin IL 60123 Email Us Jason@ponds-inc.com |
Proudly Serving Gilberts, Dundee, Elgin, South Elgin, Huntley, Barrington, Saint Charles, Batavia, Geneva, Naperville, Wheaton, West Chicago, Hinsdale, Oak Brook, Darien, Woodridge, Bloomingdale, Roselle, Medinah, Schaumburg, and Chicagoland Illinois since 1993
|
Connecting